The main volume moves backwards from the street alignment to create an open space in front. This space turns into a public garden and becomes fundamental for the organization of the whole building. It will also become the memorial space of the victims of a terrorist attack that happened in this place many years ago.
The slope of the garden also allows bringing light and views to the underground level.
The library is conceived as a civic multipurpose public building full of different activities that go beyond culture and reading. Each person or group will be able to find in the building a personal, comfortable, specific and special space.
Ajuntament de Vic
7.814.196,04 €
Building 5.168,20 sqm Landscape 541,60 sqm
Project: September 2018. Construction: March 2022
AiA Services, BACengineering structure
Toni Casamor, Project and Construction Control (collaboration BCQ).